Waste Tracking Software

EWC code ยท List of Waste

08 03 16*

Hazardous

Waste etching solutions

Hazardous entry. Waste classified under this code is hazardous. It moves on a hazardous waste consignment note, and a digital waste tracking record for it needs the hazardous property (HP) codes and components.

Code
08 03 16*
Hazardous
Yes
Chapter
08: Wastes from the manufacture, formulation, supply and use (MFSU) of coatings (paints, varnishes and vitreous enamels), adhesives, sealants and printing inks
Subchapter
08 03: Wastes from MFSU of printing inks
Source
List of Waste, legislation.gov.uk

Using 08 03 16*

  • Hazardous waste moves on a hazardous waste consignment note, not a transfer note.
  • In a digital waste tracking record, the receiving site adds the HP codes and the hazardous components and concentrations, or a reason they are not available, plus the consignment note code.
  • Report it to Defra within 2 working days of receipt, with a recovery or disposal code. Work out the deadline.

Check the description fits your waste. If no specific code fits, codes ending in 99 cover wastes not otherwise specified in the subchapter.

Other codes in 08 03

08 03 07Aqueous sludges containing inkNon-hazardous
08 03 08Aqueous liquid waste containing inkNon-hazardous
08 03 12*Waste ink containing hazardous substancesHazardous
08 03 13Waste ink other than those mentioned in 08 03 12Non-hazardous
08 03 14*Ink sludges containing hazardous substancesHazardous
08 03 15Ink sludges other than those mentioned in 08 03 14Non-hazardous
08 03 17*Waste printing toner containing hazardous substancesHazardous
08 03 18Waste printing toner other than those mentioned in 08 03 17Non-hazardous
08 03 19*Disperse oilHazardous
08 03 99Wastes not otherwise specifiedNon-hazardous

Questions

Is 08 03 16* hazardous?

Yes. It is a hazardous entry in the List of Waste.

How do I report 08 03 16* for digital waste tracking?

Record it with its HP codes, hazardous components and the consignment note code, and a recovery or disposal code. A permitted or licensed receiving site reports each load to Defra within 2 working days of receipt.