EWC code ยท List of Waste
05 01 99
Non-hazardousWastes not otherwise specified
Non-hazardous entry. Waste classified under this code is not hazardous. It moves on a waste transfer note.
- Code
- 05 01 99
- Hazardous
- No
- Chapter
- 05: Wastes from petroleum refining, natural gas purification and pyrolytic treatment of coal
- Subchapter
- 05 01: Wastes from petroleum refining
- Source
- List of Waste, legislation.gov.uk
Using 05 01 99
- Put it on the waste transfer note with a written description of the waste.
- A receiving site reports it to Defra's digital waste tracking service within 2 working days, with a recovery or disposal code. Work out the deadline.
Check the description fits your waste. If no specific code fits, codes ending in 99 cover wastes not otherwise specified in the subchapter.
Other codes in 05 01
| 05 01 02* | Desalter sludges | Hazardous |
| 05 01 03* | Tank bottom sludges | Hazardous |
| 05 01 04* | Acid alkyl sludges | Hazardous |
| 05 01 05* | Oil spills | Hazardous |
| 05 01 06* | Oily sludges from maintenance operations of the plant or equipment | Hazardous |
| 05 01 07* | Acid tars | Hazardous |
| 05 01 08* | Other tars | Hazardous |
| 05 01 09* | Sludges from on-site effluent treatment containing hazardous substances | Hazardous |
| 05 01 10 | Sludges from on-site effluent treatment other than those mentioned in 05 01 09 | Non-hazardous |
| 05 01 11* | Wastes from cleaning of fuels with bases | Hazardous |
| 05 01 12* | Oil containing acids | Hazardous |
| 05 01 13 | Boiler feedwater sludges | Non-hazardous |
| 05 01 14 | Wastes from cooling columns | Non-hazardous |
| 05 01 15* | Spent filter clays | Hazardous |
| 05 01 16 | Sulphur-containing wastes from petroleum desulphurisation | Non-hazardous |
| 05 01 17 | Bitumen | Non-hazardous |
Questions
Is 05 01 99 hazardous?
No. It is a non-hazardous entry in the List of Waste.
How do I report 05 01 99 for digital waste tracking?
Record it with a description and a recovery or disposal code. A permitted or licensed receiving site reports each load to Defra within 2 working days of receipt.